Part P

............ Accessories such as socket-outlets, control switches and ceiling roses replacing the cable for a single circuit only, where damaged, for example by fire, rodent or impact re-fixing or replacing the enclosures of existing installation components providing mechanical protection to existing fixed installations.  Work that is not in a kitchen or special location and does not involve a special installation and consists of: adding lighting points (light fittings and switches) to an existing circuit adding socket-outlets and fused spurs to an existing ring or radial circuit installing or upgrading main or supplementary equipotential bonding.  Special locations and installations are defined as: locations containing a bath tub or shower basin, swimming pools or paddling pools, hot air saunas, electric floor or ceiling heating systems, garden lighting or power installations, solar photovoltaic (PV) power supply systems, small scale generators such as microchip units, extra-low voltage lighting installations, other than pre-assembled, CE-marked lighting sets.

Foundation Building (South)LTD

Foundation Building (South)LTD has 'taken the cow by the horns' and the Director, Derek Moore, has taken all the necessary exams. Therefore, being appointed the "Duty Holder", is able to self certificate all of Foundation Building (South)LTD electrical installations after passing City and Guilds Bs2391 and Bs 7671


All necessary certificates will be supplied to all the relevant parties concerned
Prev   1 2   Back